Your location:Home >NEWS >Industry news Industry news

Centralized feeding system maintenance of film blowing machine.

2018-01-19 11:09:21 AM

First, daily maintenance.

On feed system of the main equipment to realize the specialist is responsible, in succession of observation, record the running situation, completes the registration and transfer, such as the central console parameter Settings, the operation of the vacuum station voice the dust and dust removal device processing, raw material conveying state whether smooth, compressed air is in the normal range, such as shape material phenomena.

Second, monthly maintenance.

Monthly inspection on centralized feeding system equipment, such as pipe connector seal check, filter cleaning dust removal device, seal check, air valve and sectional material valve inspection, electrical parts inspection, etc.

Third, quarterly maintenance.

Quarterly maintenance inspection, such as the rise of temperature of the vacuum stand fan, transfer line tightness, bend parts, compressed air hose, cylinder, solenoid valve, the situation of the transparent hose, etc.

Fourth, annual maintenance.

The equipment of the centralized feeding system is fully maintained every year, and it is better to use the holiday to overhaul the equipment and replace the vulnerable parts. In order to improve the utilization rate of the equipment, the normal operation of the equipment is inseparable from the normal maintenance of the equipment.